A view of Maricopa. Area context photograph; the business or event in this story is not pictured. Photo: Chris J · CC BY-SA 2.0
The Copa Farmers Market spends the hot months inside, and Sunday, Aug. 23 is one of the last indoor mornings on the calendar: 8:30 a.m. to 12:30 p.m. at Central Arizona College, 17945 N. Regent Dr. Two indoor Sundays are left after this one, Sept. 13 and Sept. 20. Then the market moves back outside to 44400 W. Honeycutt Ave. for the October through December run, same Sunday hours.
This brief records the information reported on Aug 21, 2026. Opening dates and operating details may have changed.
Read the original source
This sourced brief summarizes information from Copa Farmers Market ↗. Follow the original coverage for additional reporting and context.
Angry Chickz is under construction in a 2,700-square-foot space at South Bridge Marketplace, John Wayne Parkway and Honeycutt Avenue, two doors down from Panera Bread, InMaricopa reports. The chain serves hot chicken sandwiches and tenders at heat levels running from country up to angry. No opening date has been announced yet.
Source: InMaricopaTrick-or-treating reference photo, not the announced Maricopa event. Photo: Charles Parker. Image source: InMaricopa
Maricopa's CLA (Connect, Love, Advocate) Autism Club hosts its first Gentle Halloween Trunk or Treat on Oct. 17, 3 to 7 p.m., at Molly's House of Little Feet, InMaricopa reports. It's built to be low stim: no horns, flashing lights or loud music, plus sensory tables with kinetic sand and fidgets, goodie bags, food vendors and hour-by-hour visitor limits so families can take their time.
Source: InMaricopaThe committee's award presentation, as pictured in the source report. Photo: Ron Angerame. Image source: InMaricopa
The resident-led 347 Facts Committee took home an Arizona Transportation Partnering Excellence Award at the Arizona Conference on Roads and Streets in Tucson, InMaricopa reports. The group rallied residents to send thousands of emails to lawmakers, which helped secure about $140 million for SR 347 improvements and a spot on ADOT's five-year construction plan. Initial work began in June.